I. Process Introduction:
First calcine magnesite, then pulverize and prepare magnesium oxide powder. Make magnesium oxide powder to perform hydration reaction with water with the existence of aid and transform into magnesium hydroxide. Then implement refining, modification dehydrating, drying, pulverizing and packaging for magnesium hydroxide magma, and produce flame-retardant grade magnesium hydroxide.
II. Technical Advancement:
Magnesium conversion rate is above 98%. Product quality is in conformity with HG/t3607-2000 standard and flame-retardant grade standard required by user. The production cost is low, and the benefits are significant.
III. Market Prospect:
The present world has increasingly high requirements for environmental protection, environment-friendly magnesium hydroxide fire retardant is emphasized by all countries. Developed countries have successively made huge investment in research and development and frequently developed international cooperation. Magnesium hydroxide fire retardant has been widely applied in various plastic products, in particular, high performance magnesium hydroxide fire retardant for wire and cable is even popular among consumers. With rapid development of Chinese high molecular industry and constant perfection and improvement of flame-retardant regulations, the demand for fire retardant has increased accordingly. As non-toxic, smoke-restraining environmental protection inorganic fire retardant, magnesium hydroxide is in very urgent need.
IV. Main Economic and Technological Indicators:
Production of 1t magnesium hydroxide requires magnesite (MgO content45%) 1.81t; coal 1.6t; electricity 750kw·h; and water 17m3. Production cost is about 1,400 Yuan/t.
Market price of the product is 2,450 Yuan/t.
V. Environmental Protection: No disadvantageous impact on the environment.
VI. Form of Cooperation and Service Method:
Technical transfer. Taking responsibility for process flow design, supporting equipment of standard equipment, non-standard equipment manufacture design, equipment is plane layout design, equipment installation design, pipe network design, equipment installation guidance, equipment commissioning, production commissioning, training for production engineers, analysis staff and technicians, process operation specifications, raw material and product analysis method, and preparation of intermediate control analysis method; ensuring output, yield and quality to reach the standard; and undertaking turn-key projects.